Monday, February 22, 2010

Final load cells integrated.

Finished up the outboard bulkhead bearing points -- installed the load-cell brackets (lower right of shiny bearing bracket and also installed the limiting stops on each side.


I'm not going to install the brake caliper brackets until after dyno testing (no need for brakes on the dyno), but other than that this rear assembly is ready to install on the chassis.

Next up -- have to build the cap for the prop stand pylons then mount the prop shaft bearings, brake rotor and rear sprocket before mounting the cap and preparing to mount the prop on the chassis.